| 中国石油天然气管道局三公司 郑州市 451450
关键词: 大型外浮顶油罐工程 群立柱倒装起吊 施工技术
通过对新疆塔河油田20000m3外浮顶油罐采用群立柱倒装起吊的施工方法,为今后缺乏水源地方施工,减少高空作业、控制大罐焊接变形及保证工程施工质量提供了成功的经验。
Construction Technology of Group Tubular Legs' upside-down Installing and Liftin g in Large out-floating-roof Oil Tank
Li Guibin
China oil & gas pipeline NO.3 engineering company Zhengzhou 451450
Abstract:Brief introduction:This paper reports the method of group tubular legs upside-down installing and lifting in 20000m3 large out-floating-roof oil tanks at Tahe Oil Field in Xinjiang.It provides successful experience for reducing overhead working at absence water place,controling welding detect of large oil tanks,asuring project construction quality.
Key Words:Large out-floating-roof oil tank, Construction Technology Group tubular legs' upside-down installing,Lifting |